Direct line for architects and contractors working with BlindSpec systems. We answer specification questions, installation details, and product selection issues.
For urgent on-site questions about profiles, motorization, or fabric specs.
0543607039Send your project drawings or ask for current datasheets and installation guides.
info@blindspecifications.comVisit us for physical sample boards of aluminum profiles and fabric swatches.
9469 Terence Branch
Simelanefontein, WC 9853
We keep the SLA clear so you can plan your project milestones without delays.
For complex projects, we can schedule a call to review your drawings and provide written recommendations.
Looking for quick answers about lead times, fabric options, or motor compatibility?
Visit the FAQ sectionApproach & workflow
We work in a fixed sequence: site measurement, product selection based on orientation and load, then installation and calibration. Each step has a clear deliverable, so you know exactly what happens before we mount anything.
For motorized systems we check wiring routes and control placement early. For manual mechanisms we verify clearance and operating torque. This prevents the usual surprises during installation.
We record exact recess depth, wall squareness, and header clearance. This avoids ill-fitting blinds and returns.
South-facing glass gets screen fabric; bedrooms get blackout. We factor in solar gain and privacy before recommending.
We size tubular motors with 20–30% headroom above the calculated load, so the blind lifts reliably even after fabric stiffens.
Every unit is operated 10 times, limits are set, and fabric alignment is checked. You receive a written sign-off.
We provide a technical sheet per opening: fabric type, profile reference, motor model, and measured dimensions. This is useful for future maintenance or replacement.
Project timeline
A clear sequence of milestones we follow for every blind and solar control project. This is the practical path from your opening measurements to a working, tested system.
We verify each window dimension, check wall material, and note any obstructions. This includes measuring reveal depth and confirming power outlet locations for motorized options.
Based on orientation and light control needs, we shortlist blackout, screen, or translucent fabrics. Aluminum profiles are matched to the required structural support and finish.
We confirm manual or tubular motor specifications, torque rating, and control type. This step ensures the drive system matches the fabric weight and roller diameter.
Blinds are cut and assembled in our workshop. Each unit is tested for smooth operation, fabric alignment, and proper tension before it leaves the bench.
Certified installers mount brackets, secure the headrail, and align the bottom bar. For motorized units, we connect power and pair the remote or smart home module.
We adjust limit switches, check fabric tension, and demonstrate operation. You receive a maintenance guide and warranty documentation for each unit.
Timeline assumes standard residential or commercial openings. Custom fabric widths or complex motorization may add 3–5 working days per phase. We confirm exact dates after the site survey.