What to expect on site

Practical outcomes of a structured installation process

Every project moves through the same sequence: site survey, product confirmation, fabrication, and fitting. The value is in what each stage delivers before the next one starts — fewer surprises, clearer handoffs, and a result that matches the specification sheet.

Accurate site survey first

We measure the actual opening, check wall condition, and confirm headroom before anything is cut. This removes the most common cause of rework: dimensions taken from drawings that do not match the built space.

Fabrication against a fixed spec

Profiles are cut, drilled, and assembled from the approved product sheet — not from memory. Fabric type, motor torque, and control layout are locked in writing before production begins.

Clean handover with test results

Each unit is operated, checked for alignment, and tested for smooth travel before we leave. You receive a short record of what was installed and how it should be used.

Motor wiring done in sequence

Power points and control cables are verified before the blind is hung. This avoids the common delay of discovering a missing conduit or wrong voltage after installation has started.

Fabric handling on site

Roller tubes are cut to width and fabric is attached under controlled tension. The result is a straight drop without wrinkles or edge curl, even on wider windows.

Documented maintenance points

At the end of the job you know which parts need periodic attention — brackets, fabric edges, motor limits — and how to adjust them without calling a technician for every small issue.

Need the full sequence before you commit? Read our approach or review the available product systems.

Implementation timeline

From specification to installed system

A clear sequence of what happens after you submit a project inquiry. Each phase has defined deliverables, review points, and practical constraints so you know what to expect before work begins.

Week 1

Project intake and site data review

We collect window dimensions, orientation, glazing type, and your control preferences. For retrofit projects, we verify existing brackets and power availability at the motor location.

Week 2–3

Fabric and profile selection

Based on solar heat gain coefficients and light transmission targets, we shortlist blackout, screen, or translucent fabrics. Aluminum profiles are matched to the structural load and wind exposure for exterior systems.

Week 4

Technical drawings and dimensioning tables

You receive elevation views, mounting details, and a dimensioning table that lists fabric drop, roll diameter, and headbox size. Motor torque is calculated from the final weight of the assembled blind.

Week 5–6

Fabrication and quality control

Profiles are cut, drilled, and finished in our workshop. Fabric is cut to the specified drop with a tolerance of ±5 mm. Each motorized unit is bench-tested for travel limits and remote pairing before packing.

Week 7

Delivery and installation

Units arrive with labeled brackets and a printed installation guide. For motorized systems, we schedule a commissioning visit to set end limits, configure wall switches, and connect to your automation hub if required.

Week 8

Handover and maintenance briefing

You receive a project file with fabric care instructions, spare part references, and a recommended service interval for lubrication and tension checks. Warranty registration is confirmed by email.