Field Notes from Recent Projects

What Contractors and Architects Say After Installation

Feedback collected during post-installation reviews and follow-up site visits. These comments reflect real decisions about fabric, motorization, and profile selection.

MC

Marta Ceballos

Interior Architect, Valencia

We specified the screen fabric with a 5% openness for a west-facing office facade. The glare reduction was immediate, and the view remained clear. The aluminum profile with thermal break made a measurable difference in the interior temperature near the glass.

Project: Corporate retrofit, 42 units

DL

Daniel Louw

Project Manager, Cape Town

The tubular motor sizing table saved us from a costly mistake on the large terrace blinds. We followed the torque recommendations for the 3.2-meter width and the operation has been silent and consistent. Installation took less time than we budgeted.

Project: Hospitality terrace, 18 motors

SR

Sofia Reyes

Facility Manager, Residential Complex

We replaced the old cassette blinds with blackout fabric in the south wing bedrooms. The light leakage is gone, and the maintenance crew confirms the new brackets hold firmly even in the coastal wind. The comparative durability chart helped us justify the upgrade to the board.

Project: Residential complex, 120 rooms

Need a reference for a similar opening type?

We can share the full specification sheet and installation notes from these projects. Contact the technical desk for details.

Request project notes

Scope, definitions and limiting conditions

This technical catalogue is prepared for specification and estimation purposes. The following clarifications define the boundaries of our recommendations and the responsibilities of each party during project planning and installation.

1. Product specification limits

All dimensions, fabric selections and motor torque ratings are based on the information provided by the client. Field measurements must be verified by a qualified installer before fabrication. We do not assume responsibility for discrepancies between preliminary drawings and actual site conditions.

2. Performance data & shading coefficients

Shading coefficients and g-values are nominal values obtained under controlled laboratory conditions. Real-world performance varies with glass type, frame colour, solar angle and local climate. These figures are intended for comparative product selection, not as a final energy model input.

3. Material & finish tolerances

Anodised and painted aluminium finishes may show slight tonal variation between production batches. This is inherent to the process and does not constitute a defect. Colour matching should always be requested with a physical sample prior to mass production.

4. Motorization & electrical interface

Tubular motors require a dedicated power supply and must be installed by a certified electrician. Our wiring diagrams are indicative; final connection must comply with local electrical codes. Overload protection is the responsibility of the installing contractor.

5. Installation & site readiness

The supporting structure (wall, ceiling or fascia) must be capable of bearing the dynamic load of the blind system. We assume no liability for damage caused by inadequate anchoring, uneven surfaces or concealed utilities. A pre-installation site survey is strongly advised.